Installer Checklist - DCS BGB131 Installation, Use And Care Manual

The professional side burner
Hide thumbs Also See for BGB131:
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION

INSTALLER CHECKLIST

Specified clearances maintained to combustibles.
I
Side burner is properly mounted.
I
All internal packaging removed.
I
Burner is seated properly and does not rock.
I
Each burner lights satisfactorily, individually or with adjacent burner lit.
I
Knob(s) turn freely. Bezel(s) centered.
I
Flame adjusted.
I
Pressure regulator connected and set for 4.0"W.C. Natural, 11.2"W.C. LP gas.
I
Manual shut-off valve installed and accessible.
I
Unit tested and free of leaks.
I
User informed of gas supply shut-off valve location.
I
Battery installed in module properly and generates ignition spark when activated.
I
PLEASE LEAVE THESE INSTRUCTIONS WITH THE USER.
USER, PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE.
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bgb132-biBgb132Bgb131-bi

Table of Contents