5. Install the top cover.
This step includes sliding the server in to the equipment rack and restoring the
antitilt features to their original position. See
page
5-8.
6. Power on the server.
This step includes reconnecting power cables, verifying the state of the LEDs,
and turning the keyswitch to the Locked position. See
Using Software" on page
Note – If the Solaris automatic booting is set, use the sendbreak -d domain_id
command after the display console banner is displayed but before the system starts
booting the operating system to get the ok prompt.
7. Confirm the hardware.
This step includes running programs to be certain all components are mounted
again and then booting the operating system.
Refer to
"Verifying Hardware Operation" on page 4-9
"Replacing the Top Cover" on
4-13.
Chapter 14
"Powering the Server On
for more information.
Backplane Unit Replacement 14-13