INSTALLATION
This section describes installation of NEC Express5800/320Fc system.
Rack-mount Model
You can mount NEC Express5800/320Fc system on a rack that conforms to the EIA standards.
IMPORTANT:
NEC Express5800/320Fc system is a precision instrument. You should ask maintenance
personnel to install it.

Installing a rack

To install a rack, see the instruction that comes with the rack, or contact your sales agent or
maintenance personnel.
Room that can maintain the following
conditions:
[When operating]
Temperature: 10 to 35ºC*
Humidity: 20 to 80%
Temperature gradient: ±10ºC/hr
Atmospheric pressure: 749 to 1040hpa
[When not operating]
Temperature: 5 to 40ºC*
Humidity: 10 to 80%
Temperature gradient: ±15ºC/hr
Atmospheric pressure: 749 to 1040hpa
* It is recommended to use the server in a room where
temperature can be kept between 15 and 25ºC.
100V - 120 V or 200V - 240 V
parallel bi-polar power outlet
with grounding
Wall outlet within the
reach of supplied power
cord.
Level and reinforced
floor.
Space 40 cm or more on top, 1 m or more on
the front and rear, and 60 cm or more on the
right and left.
Place where the rack is
stabilized by the stabilizer

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800/320fc-lrExpress5800/320fc-mr

Table of Contents