Frymaster YSCFC24GSERIES YSCFC24GSERIES Service & Parts Manual page 17

Yscfc24g series flatbottom gas fryers 24/24/15 systems with built-in filtration
Table of Contents

Advertisement

1.6.6.2 Frypot/Firebox Removal/Replacement Procedure
1. Perform Procedure 1.6.5, Removing/Replacing Blower Assembly or Air Prover Switch, Steps 1 –
4.
2. Disconnect the union at the gas valve.
Remove four bolts connecting the burner
manifold brackets to the burner box.
Remove the burner manifold assembly
and set aside.
3. Mark and disconnect the drain-valve
microswitch wiring. Remove elbow or
drain-tee assembly, and then remove the
drain valve/microswitch assembly.
4. Remove two screws from control panel and lower, using care not to stretch or distort indicator
light wiring (if applicable).
disconnect wiring and set control panel aside.
If equipped with indicator lights, use a pin-pusher to remove pins from main-harness
connector, and then remove control panel.
5. Perform Procedure 1.6.1, Remove/Replace Temperature Probe or High-Limit Thermostat, Steps
7 – 11.
YSCFC SERIES FLATBOTTOM GAS FRYERS
CHAPTER 1: SERVICE PROCEDURES
If control panel is equipped with indicator lights, mark and
Remove drain
elbow and
drain valve
assembly from
the frypot.
Disconnect union at gas valve and remove four
bolts connecting burner manifold brackets to firebox
and drain valve assembly from frypot.
1-12
Disconnect
union at gas
valve and
remove four
bolts (two per
side) to
remove burner
manifold.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yscfc 1824gYscfc 2424g

Table of Contents