Frymaster FOOTPRINT 8195991 Installation And Operation Manual page 29

Gas fryers
Table of Contents

Advertisement

2. If an optional Power Shower is included,
install it now. NOTE: Verify that the
Power Shower O-ring and gasket are
present and in good condition and that
the clean-out screws are installed at each
corner.
If the fryer includes a Power Shower, DO NOT operate the filter without the Power
Shower in place. Hot oil will spray out of the fryer and cause injury.
3. After the cooking oil has drained from
the frypot, pull the filter handle forward
(outward) to start the pump and begin
the filtering process. There may be a
slight delay before the pump activates.
4. The filter pump draws the cooking oil through the filter medium and circulates it back up to and
through the frypot during a 5-minute process called polishing. Polishing cleans the oil by
trapping solid particles in the filter medium.
5. After the oil is filtered (about 5 minutes), close the drain valve and allow the fryer to refill. Let
the filter pump run 10 to 12 seconds after the oil begins to bubble (or sputter from the Power
Shower openings, if installed). Turn the filter off, remove the Power Shower if installed, and let
it drain.
Install the Power
Shower in the frypot
to be filtered.
Snap the optional Power Shower into position.
DANGER
Pull filter handle forward
to activate pump.
4-6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pro h50 seriesPro h55-series

Table of Contents