3.21 Asterisk Logs

After click on OptionsAdvanced OptionsShow Advanced Options, please select the
Asterisk Logs option from the vertical menu on the left of the main page, then you can get the
following screen:
Click on the textbox, you can get the following screen:
You can see a date table, and you can select the log to watch by clicking on the date. After
choosing the date, please click on Go button, you can see the asterisk log of the day you choosed.
st
Here I need to see the asterisk log of April 21
,2010, I click on 21 in the date table, I get the
following screen:
I click on Go button, then I get the log in the following screen: