Chapter 2 - Setup And Installation; Power Connection; Factory Configuration; Installation - Patton electronics 1200P Installation And Operation Manual

Modem eliminator, rs-232
Table of Contents

Advertisement

Caution, Disconnect the POWER Before Removing The Cover
Vorsicht, Befor Deckung Abnehmen Mach Strom Zu.

CHAPTER 2 - SETUP AND INSTALLATION

Power Connection

Before connecting the 1200P (CTS ME-V.24) to an AC power source the top cover
must be installed and secured with the supplied screws. The unit is supplied with a
110/220VA voltage switch, turn the switch
with a coin or screw driver to the appropriate
voltage for your country. EXAMPLE: United
States of America; set to 110VA. The unit is
supplied with a IEC power connector next to
the voltage select switch, plug the power
cord into the connector until it is firmly
seated. You may now connect the power
cord into your AC outlet.

Factory Configuration

The 1200P (CTS ME-V.24) is configured prior to shipment with the switches and
jumpers in the following default positions:
SW1 - 1 ON
ON
ON, 2 OFF
ON
ON
OFF
OFF
OFF
OFF (CLK1)
3 OFF
OFF
OFF
OFF, 4 OFF
OFF
OFF
OFF
OFF
OFF, 5 ON
6 OFF (Signal and Chassis Ground NOT Connected)
ON
ON
SW2 - 1 & 2 ON
ON
ON (CTS Delay = 0)
ON
ON
3 & 4 ON
ON (DSR Switched)
ON
5 & 6 ON
ON
ON
ON
ON (DCD Switched)

Installation

Set switches to match the required configurations based on the diagrams below.
The cabling between each device and the 1200P (CTS ME-V.24) must be terminated
with male connectors.
Patton Electronics Co.
ON (9600bps)
ON
ON
ON
1200P
I
NSTALLATION
2-1
A
O
M
ND
PERATIONS
ANUAL
Setup & Installation
112001UA
11 0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cts me-v.24

Table of Contents