Completing The Installation - Patton electronics 2616RC Getting Started Manual

T1/e1 tdm-digital access concentrator (t-dac)
Hide thumbs Also See for 2616RC:
Table of Contents

Advertisement

Model 2616RC T-DAC Getting Started Guide

Completing the installation

This section verifies that the Model 2616RC is fully operational.
1. Verify that the green POWER LED is lit. If the POWER LED is flashing green, refer to Chapter 5,
bleshooting and maintenance"
2. Verify that the WAN LED illuminates, indicating that the Model 2616RC is synchronizing with the
T1/E1 signal.
3. Verify that after 5 seconds, the WAN LED begins flashing, indicating that the Model 2616RC is satisfied
with the quality of the T1/E1 signal.
4. Verify that after 10 seconds, the WAN LED extinguishes, indicating that the Model 2616RC is satisfied
with the network signal and that the link is ready for use.
5. Verify that the green Ethernet LED is either flashing (indicating link status is nominal for the front Ether-
net port) or on solid (indicating that link status is nominal for at least one of the Ethernet backplane con-
nections).
The Model 2616RC is operational.
Maintenance
on page 60.
5 • Troubleshooting and maintenance
"Trou-
71

Advertisement

Table of Contents
loading

Table of Contents