Model 3095 mDSL DACS Getting Started Guide
export parameters to a text file. Select the location where you want the file stored, type a file name, and click
.
Save
Figure 29. Saving the access server flash memory configuration data as a text file

Completing the installation

This section verifies that the Model 3095 is fully operational.
1. Temporarily disconnect the male ends of both power cords from the power outlet. Wait 30 seconds, then
plug the power cords in again.
2. Verify that the green POWER LED is lit. If the POWER LED is flashing green, refer to Chapter 5, "Trou-
bleshooting and maintenance".
3. Verify that the WAN 1 Frame LED illuminates, indicating that the DACS is synchronizing with the T1/E1
signal.
4. Verify that after 5 seconds, the WAN A Error LED begins flashing, indicating that the DACS is satisfied
with the quality of the T1/E1 signal.
5. Verify that after 10 seconds, the WAN A Error LED extinguishes, indicating that the DACS is satisfied
with the network signal and that the link is ready for use.
Note

Completing the installation

If the DACS does not respond as described, the most likely cause is
that the DACS default settings are not compatible with the T1/E1
line. If this is the case, use the RS-232 CONFIG port to correct the
DACS settings. You will have to examine the T1/E1 Link section in
the configuration pages in the DACS.
3 • Configuring the DACS for operation
49