Download Print this page

Trane CLCH-IN-18A Installation Manual page 8

Climate changer roof curb

Advertisement

Table 2
Pipe Chase Roof Curb Dimensions
Unit size
Reduced
17.50
3-30
18.00
35-40
21.00
50-100
Reduced
Standard
Extended
Lp is the sum of the module length(s) covered by the pipe cabinet.
Refer to submittal.
6
L Dimension
Standard
Extended
33.00
48.50
34.00
50.00
40.00
54.50
Unit Sizes 3-100
X Dimension
Lp + 1.125
Lp + 1.125
Lp + 1.125
q
The height of the pipe chase roof curb should be
1.75 inches less than the height of the unit roof
curb. See
Figure 17
q
The pipe cabinet roof curb will need to be notched
in order to install a special gutter piece.
shows a dimensioned detail of the pipe cabinet
roof curb being installed to the unit roof curb.
Please note the notched section to get the
dimensions. Refer to Step 6 of Assembly and
Installation Instructions section for more
information on installing the gutter piece.
18
shows the pipe cabinet and gutter coming
together and assembling to the pipe cabinet roof
curb.
Figure 17
Detailed Notching
Gutter
Pipe chase
roof curb
.178
Figure 18
Assembly
q Figure 19
shows a right side view and isometric
view of a fabricated gutter piece with detailed
dimensions.
.
Figure 17
Figure
3.318
.868
1.750
1.060
Unit
roof
curb
2.942
CLCH-IN-18A

Advertisement

loading

This manual is also suitable for:

T-series