Zibro S185 Operating Manual page 10

Pvg international b.v.
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Pipe insulation:
a.
Place the drainage hose under the pipe.
b.
Use insulating material exceeding 6 mm in
thickness.
-
The drainage hose must slope downwards
slightly in order to allow moisture to drain
away easily.
Ensure that the drainage hose is not
twisted and does not protrude. The end
may not hang in the water.
If the drainage hose is extended with a hose, the section running alongside the indoor unit must be
insulated.
-
If the wire/pipes are on the right hand side, the wires/pipes, power cable and drainage hose must be
insulated and fastened to the back of the indoor unit with a pipe clamp.
A.
Fasten the pipe clamp to the groove.
Mounting plate
B.
Press the clamp to attach it to the mounting plate.
Connecting the pipes
a.
Connect the indoor unit pipes with two nut spanners. Select the
correct tightening moment in order to prevent the pipes, con-
necting pieces and nuts from being deformed or damaged.
b.
First tighten by hand, and then with nut spanners.
Model
Pipe dimensions
S95/S125/S185
S245
S95
S125/S185
S245
4
10
Power cable 1
(heat pump)
Pipe clamp
Mounting plate
Tightening
moment
Large pipe
Power cable
Wiring of defrosting
regulator (heat pump)
Push through
here
Pipe clamp
Mounting plate
Nut
size
Insulating pipe
Small
pipe
Drainage hose
Tape
Hook here

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

S245S95S125

Table of Contents