Installation; Unpacking The Analyzer; Mounting The Analyzer - Teledyne 3010MA Operating Instructions Manual

Paramagnetic oxygen purity analyzer
Table of Contents

Advertisement

Paramagnetic O2 Purity Analyzer

Installation

Installation of the Model 3010MA Analyzer includes:
1. Unpacking
2. Mounting
3. Gas connections
4. Electrical connections
5. Testing the system.
6. Initial Sensor Calibration
This chapter covers installation of the Control Unit. The Analysis
Unit installation is covered in Part II of this manual. Procedures for the
Initial Sensor Calibration is given in Part II Section 6.6.

3.1 Unpacking the Analyzer

The analyzer is shipped with all the materials you need to install and
prepare the system for operation. Carefully unpack the analyzer and
inspect it for damage. Immediately report any damage to the shipping
agent.

3.2 Mounting the Analyzer

The Model 3010MA is for indoor use in a general purpose area. It is
NOT for use in hazardous environments of any type.
The standard model is designed for flush panel mounting. There are
four mounting holes—one in each corner of the rigid frame. An outline
drawing D73635, is included in the Drawings section in the rear of this
manual which contains a panel cutout diagram.
On special order, a 19" rack-mounting version can be provided. For
rack mounting, the 3010MA Control Unit and Analysis Unit are flush-
panel mounted side by side on the rack panel. Figure 3-1 is a drawing for a
typical 19 inch rack mounted Model 3010 MA.
Teledyne Analytical Instruments
Installation
25

Advertisement

Table of Contents
loading

Table of Contents