Installation; Unpacking The Control Unit; Mounting The Control Unit - Teledyne 3010TAC Operating Instructions Manual

Trace oxygen analyzer
Table of Contents

Advertisement

Oxygen Analyzer
Installation of Model 3010TAC Analyzers includes:
1. Unpacking, mounting, and interconnecting the Control Unit and
2. Making gas connections to the system
3. Making electrical connections to the system
4. Testing the system.
This chapter covers installation of the Control Unit. (Installation of
the Analysis Unit is covered in Part II of this manual.)
3.1
The analyzer is shipped with all the materials you need to install and
prepare the system for operation. Carefully unpack the Control Unit and
inspect it for damage. Immediately report any damage to the shipping
agent.
3.2
The Model 3010TAC Control Unit is for indoor use in a general
purpose area. It is NOT for hazardous environments of any type.
The standard model is designed for flush panel mounting. Figure 3-1
is an illustration of a Model 3010 standard Control Unit front panel and
mounting bezel. There are four mounting holes—one in each corner of the
rigid frame. Drawing number D-66192, at the back of this manual, con-
tains a panel cutout diagram.
On special order, a 19" rack-mounting can be provided. Per order, one
or two 3010TAC series Control Units are flush-panel mounted on the 19"
rack panel. See Figure 3-2.

Installation

the Analysis Unit

Unpacking the Control Unit

Mounting the Control Unit

Teledyne Analytical Instruments
Part I: Control Unit
Part I:
3-1

Advertisement

Table of Contents
loading

Table of Contents