13. Also bind each of these bundles of cables with a short hook-and-loop fastener at a
location near the floor panel. (See (11) in
Binding the cables near the floor panel facilitates cable handling through floor panel
openings.
Magnified View of Part C (M8000, Rear View)
FIGURE 4-15
4-46
SPARC Enterprise M8000/M9000 Servers Service Manual • October 2012
)
FIGURE 4-15