Figure 17. Connecting Two Series 1085 Bases - Powerware 9350 Installation Manual

1085 series; 685 series; auxiliary battery cabinets
Table of Contents

Advertisement

Front of
Battery Cabinet #1
3.
Locate the large flat bracket from the field kit. Place the bracket over the stud
on the bottom side of battery cabinet #1 lower hinge, and over the stud on the
bottom side of battery cabinet #1 lower hinge. Attach the bracket with two M8
self-locking nuts from the field kit (see Figure 17).
4.
Locate the ground wire from the field kit. Route the ground wire from the
customer ground stud in battery cabinet #1, under the lower right-hand battery
tray, into the cable access area in battery cabinet #2, and attach to customer
ground stud. Hardware is provided on each ground stud.
5.
Repeat Steps 1 through 4 to join additional Series 1085 Battery Cabinets
together.
24
Bracket from kit
Nut from kit
Nut from kit

Figure 17. Connecting Two Series 1085 Bases

Powerware 9350 Series 685 and 1085 Auxiliary Battery Cabinets
Ground
Wire
Existing
hinge
Front of
Battery Cabinet #2
Installation Manual 164201408 Rev. P00 053002
Ground
Studs

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

685 series1085 series

Table of Contents