8. Inspect the area behind the external breaker box to make sure
all wires are moved out of the way to prevent damage during
drilling. See Figure 3.4.
9. Using the template provided with these instructions, make a
1 1/8" hole just behind the breaker box. See Figure 3.5.
Note: 2013 and later models have a prepositioned dimple to
mark the center of the hole.
14
Figure 3.4 - Checking Wire Clearance
Figure 3.5 - Drilling Mounting Hole.