Section 3 Air-cooled Installation
3.1 — Installation
1. Unlock both locks, open the generator's lid and remove the
front panel.
2. Switch generator to OFF. Remove the generator panel fuse.
See Figure 3.1.
Note: There are different controller configurations for various
model years.
3. Turn the main breaker in the home's electrical panel into the
OFF position.
4. Remove the T1 fuse from the transfer switch.
12
Figure 3.1 - Generator Controllers
Mobile Link
Need help?
Do you have a question about the Mobile Link Unit and is the answer not in the manual?
Questions and answers