Mechanical Recommendations for the Rack
Use equipment racks that meet the following mechanical recommendations:
1
Use an open style, 19-inch rack to facilitate easy maintenance and to provide proper ventilation.
2 Use a rack made of steel or aluminum.
3 The rack should use the universal mounting rail hole pattern that is identified in IEC Standard 297.
4 The rack should have designated earth grounding connections (typically on the base).
5 The rack must meet earthquake safety requirements equal to that of the installed chassis.
6 The mounting holes should be flush with the rails to accommodate the chassis.
7 The rack should support approximately 1260 pounds (572 kilograms).
Use Protective Grounding for the Rack
Use a rack grounding kit and a ground conductor that is carried back to earth or to another suitable
building ground.
All Extreme Networks switches are designed with mounting brackets that provide solid metal-to-metal
connection to the rack. If you do not use equipment racks, you can attach wiring terminals directly to
the mounting brackets for appropriate grounding. Extreme Networks switches have grounding
terminals that are mounted on the back of the chassis.
Note
Because building codes vary worldwide, Extreme Networks strongly recommends that you
consult an electrical contractor to ensure proper equipment grounding for your specific
installation.
At a minimum, follow these guidelines to ground equipment racks to the earth ground:
1
CAD weld appropriate wire terminals to building I-beams or earth ground rods.
2 Use the appropriate chassis grounding wire for your system; the correct size depends on the
available input current to the power supply. For AC systems using a 20A breaker per PSU (SSI AC),
the chassis ground can be as small as 14 AWG. The power cable ground should be the same size as
the primary.
Note
For complete details on power supplies and power supply cords, refer to
and to
3 Position the earth ground as close to the equipment rack as possible to maintain the shortest wiring
distance possible.
4 Use a ground impedance tester or micro-ohm meter to test the quality of earth ground connection
at the chassis. This will insure good grounding between the chassis, rack, and earth ground.
Meet Space Requirements for the Rack
The rack must have enough space around it for servicing.
Provide enough space in front of and behind the switch so that you can service it easily.
a Allow a minimum of 48 inches (122 cm) in front of the rack and 24 inches (61 cm) behind the
rack.
BlackDiamond X8 Series Switches Hardware Installation Manual
Selecting Power Supply
Cords. Drill and tap wire terminals to equipment racks.