PEERLESS Pinnacle PI-199 Installation, Operation & Maintenance Manual page 7

Stainless steel gas boilers
Hide thumbs Also See for Pinnacle PI-199:
Table of Contents

Advertisement

2.
3.
4.
5.
Size the supply and return to suit the system. Refer
to Figure I. Refer also to the I-B=R
Installation
Guide No. 2000 and the Peerless Water Survey for
additional
guidance during water piping installation.
The boiler incorporates
a pressure switch in the
Outlet Manifold. This switch will not let the boiler
operate
without a minimum of 10 PSI on system.
Refer to Figure ] for suggested controls and
components
location in the near boiler piping.
In older hydronic systems where sediment may exist,
install a basket strainer to prevent particles from
returning to boiler.
Install this boiler so that the gas ignition system
components
are protected from water {dripping,
spraying, etc.) during appliance operation
and
service {circulator replacement,
condensate
trap,
control replacements,
etc.)
6
7.
8.
If this boiler
and distribution
system
is used
in
conjunction
with a refrigeration
system,
i_Jipe the
chilled
medium
in parallel
with the boiler
and install
the proper
valve
to prevent
the chilled
medium
from
entering
the boiler
When the boiler is connected
to heating coils
located in air handling units where they may be
exposed to refrigerated
air circulation,
install flow
control valves or other automatic
means to prevent
gravity circulation of the boiler water during the
cooling cycle.
If the boiler is installed above radiation
level, provide
a low water cutoff device at the time of boiler
installation.
All piping must be properly supported. See Figure 1.
SYSTEM
_ (_
F_jt_
(_) _RGE
& BALANCE
VALVE
_UP=PLY__
_ I_ BACK rL_,4
pREVeNTER
._.
_ I_) LOW pRESSURE
FIED
(15
_
NQIqI_L}
_ I_ EXPANSION
T&_
t _I)Alll
VEtlT (Mi rco
bubbler
Air
Etimtnltol"
Recmer_led)
• _ DRAIN
VALVE
_ TEMPERATURE
I pRESSURE
GAEE
tITE_$U
I_PLIEOBYC_ITRACTOR
CONNECT
TO
_OILER
SUPPLY
I_IT
SYSTEM
F_
I_
_VltCH
CD_N
_
E:o_JST E
_
rl/KET
CONNECT
TO
BOILER
RETURN
COLD
_.L pe._= _U=T E
_m_lU.V
_ttW'a_T[It
_IU_R
HO
¢OL_
_l_ONt
NOTE: I_I
U_R CONNECTIONS
ARE I I/i"
N_T
LEfT _I_
VI{W
Figure
1:
Supply
and Return
Near Boiler Piping
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pinnacle pi-140Pinnacle pi-80

Table of Contents