PEERLESS Pinnacle PI-199 Installation, Operation & Maintenance Manual page 16

Stainless steel gas boilers
Hide thumbs Also See for Pinnacle PI-199:
Table of Contents

Advertisement

DIAGRAMS
FOR VERTICAL
VENTING
STRAIGHT
COUPLING
_J
MAINTAIN12", (18" FOR CANADA),_
MINIMUMCLEARANCEABOVE
NORMAL SNOW LINES.
I
t
BO/LER
O T&P
RIGHT S_DE _IEW
3,,
INTAKE
STRA_HT
COUPUNG
r J
3"
EXHAUST
ex_ust
OUTU_T
,,
24"
MIN.
MAINTAIN 12_, (18" FOR CANADA),_
I
"",
DO NOT EXTEND MORE THAN
24" ABOVE ROOF LINE.
BOILER
m
OT&P
R_HT SlOE VIEW
3,,
fNTAKE
STRAIGHT
COUpLiNG
3"
_T
_TL_r
EXHAUST
*'_[MPORTANT NOTE: All vent pipes must be glued, properly
supported,
and the exhaust must be pitched minimum
of a
1/4" per foot back to the boiler (to allow drainage
of
condensate).
Figure
1 1: 3" Roof Vent with Tee (Intake)
6'
Coupling
(Exhaust)
**IMPORTANT NOTE: All vent pipes must be glued, properly
supported,
and the exhaust must be pitched minimum of a
1/4" per foot back to the boiler (to allow drainage
of
condensate).
Figure
12: 3"" Roof Vent with 3" Concentric
Vent
Kit (KGAVTO6OICVT)
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pinnacle pi-140Pinnacle pi-80

Table of Contents