PEERLESS Pinnacle PI-199 Installation, Operation & Maintenance Manual page 14

Stainless steel gas boilers
Hide thumbs Also See for Pinnacle PI-199:
Table of Contents

Advertisement

ivl _ _lih_[€]
i].
f-'ll;t
h_llllitill_ll
Ih_t-'tP-1!l!-'_l / [l]_
I.
For minimum and maximum
pipe length rpfer to
Table 4.
2
Use same
material
as noted
in Section
C for exhaust
vent
3
Air inlet pipe connections
is located in the rear of
boiler and is marked "air inlet" Connection
is a slip
fit. No sealant is required.
4. All joints and fittings are to be assembled
as per
instructions for vent pipe in Section C.
5
A screened
inlet air tee is provided
with boiler, to be
used as an outside termination.
6.
Provide same suport means as noted for exhaust
vent in Section C.
Table
4:
Minimum/Maximum
Vent
Length
Total Combined
**Equivalent
Length
of 3 _
Exhaust
Vent Plus 3 _ Air Inlet
Vent
Boiler
Model
*Minimum
Length
*Maximum
Length
All
16 feet
85 feet
*Lengths are the combined
added lengths of the exhaust
vent and air inlet vent.
**Include equivalent
length of fittings as follows:
3" 90 degree elbow = 5 equivalent
feet
3" 45 degree elbow - 3 equivalent
feet
3" concenlric
vent kit = 3 equivalent
feet
3" air inlet tee = 0 feet
3" VI000 vent kit = 0 feet
Refer to Venting Diagram Figures 7 through 12 for Sidewall
and Vertical Venting arangements.
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pinnacle pi-140Pinnacle pi-80

Table of Contents