PEERLESS Pinnacle PI-199 Installation, Operation & Maintenance Manual page 15

Stainless steel gas boilers
Hide thumbs Also See for Pinnacle PI-199:
Table of Contents

Advertisement

DIAGRAMS
FOR SIDEWALL
VENTING
BOILER
OT&P
_j===_
_"TS_EWW
EXTERIOR
WALL
ST_mHT
CcuPUNG
--.
--
1" MIN.
_
INTAKE
_12"_
BOILER
3" EXHAUST
R_"T _OZ ViEW
T_E {VERTICAL_
COUPLING
TEE (VErtiCAL)
FRONTeLEVAT_N
qMULTIPLeVENTS)
EXTERIOR
WALL
1" MIN,
EXHAUST
....
STRAIGHT
_
INTAKE
SlDEE_EVAXl0N
**IMPORTANT NOTE: All vent pipes must be glued, properly
supported,
and the exhaust must be pitched minimum of a
1/4" per foot back to the boiler (to allow drainage
of
condensate).
Figure 7:
3" Sidewall
Vent with Tee (Intake)
b
Coupling
(Exhaust)
**IMPORTANT NOTE: All vent pipes must be glued, properly
supported,
and the exhaust must be pitched minimum of a
1/4" per foot back to the boiler (to allow drainage
of
condensate).
Figure 8:
3 _ Sidewall
Vent with Tee (Intake)
8"
Coupling
(Exhaust)
BOILER
OT&P
RIGHT SIDE ViEW
INTAKE
3"
coupu_
eX_XUST
OUTLET
EXHAUST
EXTERIOR
WALL
VI000
VENT KIT
BOILER
OT&P
RIGHT
SIDE
V_EW
EXTERIOR
WALL
--IMFOR_ANT
_NTAKE
LEG
MUST
WE FACI_
Up**
"_r--_INTAKE
ST_,aHr
EXHA
T
¢_pu,o
US
**IMPORTANT NOTE: All vent pipes must be glued, properly
supported,
and the exhaust must be pitched minimum of a
i/4" per foot back to the boiler (to allow drainage
of
condensate).
Figure 9:
3 _ Sidewall
Vent with VlOOO Kit
**IMPORTANT NOTE: All vent pipes must be glued, properly
supported,
and the exhaust must be pitched minimum of a
1/4" per foot back to the boiler (to allow drainage
of
condensate).
Figure
10:3 _ Sidewall
Vent with 3 _ Concentric
Vent Kit (KGAVT06OICVT)
12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pinnacle pi-140Pinnacle pi-80

Table of Contents