Installation Preparation
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
Pencil and tape measure
Spirit level
Safety glasses
Phillips screwdriver
LI _{C]D
Flashlight
Metal snips
Electric drill with 3/16" bits,
#2 Phillips and flat head
Ste ladder
Pliers
Wire cutter/stripper
UL listed wire nuts
©
Aluminized
Strain relief for
Duct tape
junction box
Saber saw or Key Hole saw
8" round metal
duct, length to
suit installation
120V 60Hz. 15 or 20 Amp,
2-wire with ground, properly
grounded branch circuit
REMOVE THE PACKAGING
CAUTION: Wear g,oves
to
protect
against sharp edges.
• Remove the duct covers.
• Remove the hardware
bag, literature
package
and other boxed parts.
• Remove and properlg discard the protective
plastic wrapping
and other packaging
materials.
• Remove packing foam from behind the blower.
11