PARALLELED DUAL FX SYSTEM

• All AC wiring from the AC source and to the AC loads must collectively handle 100 amps AC or more.
• All other AC wiring capacity must equal 60 amps AC (Mobile FX units must handle 30 amps AC).
• A paralleled dual FX system can continuously power four 7.2kW of loads depending on which model
is used.
Note: Program the lowest-installed FX as Master (1-2ph MASTER) and the second FX as an OutBack L1
Slave (OB SLAVE L1)
Parallel/Dual System with Two FXs