5
.
Task 1: Prepare a Site Plan
Task 2: Plan Fiber-Optic Cable Routing
Task 3: Consider Interoperability with Fabric Elements
and End Devices
Task 4: Plan Console Management Support
Task 5: Plan Ethernet Access
Task 6: Plan Network Addresses
Task 7: Plan SNMP Support (Optional)
Task 8: Plan E-Mail Notification (Optional)
Task 9: Establish Director and HP EFC Server Security
Measures
Task 10: Plan Phone Connections
Task 11: Diagram the Planned Configuration
Task 12: Assign Port Names and Nicknames