This guide assumes that the user has followed the instructions on the printed Start Here poster
to install the StoreOnce System in the Data Center and establish an initial 1 GbE network
connection for the StoreOnce Management Console.
IMPORTANT:

Structure of the guide

The guide is divided into two sections. The first section is task based and describes how to log
in to the StoreOnce GUI to complete basic configuration tasks. The second section provides
reference information for the hardware and physical connection to Ethernet or Fibre Channel.

Overview of configuration tasks

Table 1 Configuration checklist
Task
1
The Start Here poster describes a basic installation with
connection to LAN port 1, which is valid for all products.
Make sure you understand what has been factory installed
and configured on your system and any further cabling
requirements. Available options for network and Fibre
Channel connectivity will depend upon the type of model.
2
Make sure all reference material is to hand.
3
StoreOnce 5500 only: Review SAS cabling requirements.
4
Boot up the system and, if you are using a Network
Management application, such as Insight Remote Support,
configure iLO. (You can also configure iLO after
configuring the StoreOnce System.)
5
Log on to the StoreOnce Management Console and check
system, storage and optional hardware status.
6
Configure licenses.
7
Configure time zone and NTP server.
8
Configure users.
9
Configure email.
10
Configure SNMP.
11
Apply the SSL certificate.
12
If necessary, expand storage.
13
Check software version.
14
Configure Remote Support via STaTS.
15
Configure the network.
16
Configure Fibre Channel.
17
Complete configuration.
18
Use the StoreOnce CLI to run a confidencecheck report
on the system.
6
Preparing for Basic Configuration
All tasks described in this guide require an admin user logon.
Refer to
Hardware overview (page 53)
Other sources of information (page 8)
SAS cabling for StoreOnce 5500 Systems (page 10)
Powering up and setting up iLO (page 16)
Logging in to the HPE StoreOnce System (page 21)
Configuring licenses (page 23)
Setting time zone and configuring NTP (page 27)
Creating user accounts and changing
passwords (page 29)
Setting up email alerts (page 31)
Setting up SNMP traps (page 33)
Generating the SSL certificate (page 37)
Expanding storage (page 38)
Checking software version (page 40)
Configuring Remote Support via STaTS (page 42)
Completing network configuration (page 44)
Configuring Fibre Channel (page 67)
Additional configuration tasks (page 50)
Running a system confidence check (page 51)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storeonce 3500Storeonce 5100Storeonce 5500

Table of Contents