Installation - Jenn-Air JXT8136ADS Installation Manual

35-3/8” (90 cm); 42”
Hide thumbs Also See for JXT8136ADS:
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION

Add Blockings
Front
Support Bracket
INSTALLATION
Fasten Ceiling Plate
Fasten Support Frame
Mounting the Range Hood
1. Add and secure blockings (minimum 2x4 studs)
onto ceiling joist.
2. Center, mark and fasten Ceiling Plate onto ceiling
where hood is to be hung. Make sure front of
bracket is facing as shown on diagram.
3. Determine height of hood, measure and attach four
support arms onto blower unit with screws provided;
use predrilled holes on blower unit and support arms.
Make sure tabs on top of the arms are facing out for the
front, and sideways for the rear, as shown on diagram.
Attach support "U" bracket.
4. Slide telescopic duct covers onto the top of the
blower unit.
5. Attach duct work to the ceiling and position the electrical.
6. Lift blower unit and fasten to Ceiling Plate (lock tabs on
support frame into slots on CeilingPlate); secure support
frame to Ceiling Plate with screws provided.
7. Connect duct work and electrical to the blower unit.
(slide duct covers up to gain access to the top of the
blower unit).
6
rear
front
Support Arms with
Tabs position
Dimensions of
Support Arms
23.25"

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jxt8142ads

Table of Contents