Figure 3-4. Board Frame And Metal Stay Removal; C160 I/F Board Removal - Epson CBB Service Manual

Epson terminal printer service manual
Table of Contents

Advertisement

Disassembly and Assembly
5.
Remove 3 CPS (M3 6) screws fixing the board frame to the mechanism and 1 CPS (M3x6) screw
fixing the metal stay between the board frame and the right side frame. Then remove the metal stay.
6.
Remove 2 CPS (M3 6) screws fixing the transpearency plate, then remove it.
7.
Release the 3 hooks securing the FFC cable to the board frame then remove the board frame.
Metal stay
Transpearency plate

Figure 3-4. Board Frame and Metal Stay Removal

3.2.3 C160 I/F Board Removal

1.
Remove the upper case (see Section 3.2.1).
2.
Remove 2 CPS (M3 6) screws and 1 CBB (M3 10) securing the C160 I/F Board to the mechanism and
bottom case.
3.
Disconnect CN1 on this board; then remove it by lifting it up.
3-4
CPS(M3x6)
CPS(M3x10)
Grounding Plate
Figure 3-5. C160 I/F Board Removal
EPSON Stylus Color 200 / EPSON Stylus 200
CPS(M3x6)
1
Board Frame
0
CPS(M3x10)
CBB(M3x10)
CPS(M3x6)
Rev. A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M4x11Stylus 200

Table of Contents