Hard Drive Led Cable Option - HP ProLiant ML110 - G2 Server User Manual

Hp proliant ml100 series server user guide
Hide thumbs Also See for ProLiant ML110 - G2 Server:
Table of Contents

Advertisement

Install the hard drive.
5.
Close the bezel.
6.
Resume normal server operations.
7.
Determine the status of the hard drive from the hot-plug SAS hard drive LED combinations
8.
SATA hard drive LED

Hard drive LED cable option

This section provides the following procedures:
Installing the LED cable (ML110 G4) (on page 23)
Installing the LED cable (ML150 G3) (on page 26)
Installing the LED cable (ML110 G5, ML115 G5, and ML150 G5) (on page 28)
combinations" on page 60).
("SAS and
Hardware options installation 22

Advertisement

Table of Contents
loading

Table of Contents