Storage Controller Option; Sas Hard Drive Led Cable Option - HP ProLiant DL120 User Manual

G6
Hide thumbs Also See for ProLiant DL120:
Table of Contents

Advertisement

Connect all internal cables for expansion boards.
11.
Install the access panel.
12.
Install the server into the rack.
13.

Storage controller option

IMPORTANT:
documentation that ships with the option.
To install the component:
Power down the server (on page 15).
1.
Remove the server from the rack (on page 15).
2.
Remove the access panel (on page 16).
3.
Remove the PCI riser board assembly (on page 16).
4.
Remove the hard drive cables.
5.
Install the storage controller
6.
Connect the storage controller cable to the controller and to the hard drive.
7.
See the server installation sheet and the documentation that ships with the storage controller.
IMPORTANT:
properly.
Install the PCI riser board assembly (on page 17).
8.
Install the access panel.
9.
Install the server into the rack.
10.

SAS hard drive LED cable option

The SAS hard drive LED cable provides LED functionality for SAS hard drives when an optional SAS controller
and an optional SAS controller cable are installed.
To install the component:
Power down the server (on page 15).
1.
Remove the server from the rack (on page 15).
2.
Remove the access panel (on page 16).
3.
Install the optional SAS controller
4.
For additional installation and configuration information, refer to the
("Expansion board
The server does not power up if the PCI riser board assembly is not seated
("Expansion board
option" on page 34).
option" on page 34).
Hardware options installation 37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proliant dl120 g6

Table of Contents