Mounting; Display Unit - Furuno FCV-1100L Installation Manual

Color lcd sounder
Hide thumbs Also See for FCV-1100L:
Table of Contents

Advertisement

1. MOUNTING

1.1 Display Unit

Mounting considerations
Locate the unit out of direct sunlight.
The operator should face the bow while viewing the display screen.
Select a location where the display screen can be easily observed while operating the control
unit.
Leave sufficient space around the unit for maintenance and servicing. Recommended
maintenance space appears in the outline drawing at the back of this manual.
WARNING
Turn off the power at the switchboard
before beginning the installation.
Fire or electrical shock can result if the
power is left on.
1-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents