3.
Perform Post-server Switchover Operations
For details on the operations that must be performed after server switchover, refer to "4.3 Post-Switchover Operations" in
the "Operation Guide VE".
-
Replacing a Server with no Spare Server Assigned
When WWN information has been configured, use the following procedure to change the WWN information to that of the WWPN
value of the replaced HBA.
1.
Delete the Target CA
When there are target CA settings in the WWN information, stop the server and then delete the target CA settings (set them as
hyphens ("-")).
2.
Replace the Server
Replace the HBA of the server.
Change the OBP settings of the replacement server to match the operating environment.
For details on OBP settings, refer to "8.2 Configuring the Server Environment" in the "Design Guide CE".
Shut down the server after completing OBP settings.
When the target CA was deleted in step 1, configure zoning and host affinity settings in the WWPN value of the replacement
HBA.
For details, refer to the ESC users guide.
3.
Change the WWN Information Settings
Change the WWN information settings for after server replacement to the WWN value of the HBA after server replacement.
When the target CA was deleted in step 1, configure a new target CA.
After configuration, restart the server.
After starting the server, check the status of the server's HBA from ESC.
When the HBA status is "unknown", delete it.
When the HBA status is displayed as "access path inheritance is required" (yellow icon), perform access path inheritance.
For details, refer to the ESC users guide.
When the target CA was not deleted in step 1, configure the target CA as a hyphen ("-").
-
When SPARC M10-4S are in a Building Block Configuration
No specific action is required in Resource Orchestrator.
For PRIMEQUEST Servers
-
Replacing a Server Assigned with Spare Servers
Use the following procedure to switch applications over to a spare server and replace a server with minimal interruption.
1.
Perform Server Switchover
Switch over the server to replace with its spare server.
For server switchover, refer to "Chapter 4 Server Switchover" in the "Operation Guide VE".
The server is automatically powered off after switchover.
2.
Replace the Server
Replace the server.
Use the Maintenance Wizard of the Management Board Web-UI to perform replacement.
For details on the Maintenance Wizard, refer to the PRIMEQUEST manual.
Also, change the BIOS settings of the replacement server to match the operating environment.
For details on BIOS settings, refer to "8.2 Configuring the Server Environment" in the "Design Guide CE".
Shut down the server after completing BIOS settings.
3.
Reconfigure Hardware Properties after Replacement
After replacing the server, reconfigure Resource Orchestrator with the latest hardware properties.
For details on how to reconfigure hardware properties, refer to