Verifying The Hardware Operation; Hot Replacement/Hot Addition - Fujitsu SPARC Enterprise M3000 Service Manual

Hide thumbs Also See for SPARC Enterprise M3000:
Table of Contents

Advertisement

1. Type the cfgdevice -c unconfigure command from the Oracle Solaris OS
to integrate the FRU into the Oracle Solaris OS.
# cfgadm -c configure Ap_Id
The Ap_Id is shown in the output of cfgadm (for example, disk#0).
2. Type the cfgadm -x command to confirm that the CHECK LED is off.
# cfgadm -x led=fault, mode=off Ap_Id
The Ap_Id is shown in the output of cfgadm (for example, disk#0).
The CHECK LED (amber) of the HDD is turned off.
3. Type the cfgadm command to verify that the FRU has been configured.
# cfgadm -a
The configured FRU is displayed as being configured.
The READY LED (green) of the HDD goes on.
4.3.4

Verifying the Hardware Operation

Confirm the status of the LED indicators.
For information on the LED status, see
4.4

Hot Replacement/Hot Addition

In hot replacement, the target FRU is operated while the domain to which the FRU
belongs is stopped.
Depending on the target FRU, there are two cases as follows:
Power supply unit/Fan unit: operated with XSCF commands. See
"FRU Removal and Replacement (Power supply unit/Fan unit)" on page
Hard disk drive: operated directly, not by using XSCF commands.
For hot addition, do the same operation as that for hot replacement.
and
TABLE 2-3
TABLE 2-5
Chapter 4
FRU Replacement Preparation
.
Section 4.4.1,
4-8.
4-7