Hitachi CP-X4021N User Manual page 35

Instant stack guide
Hide thumbs Also See for CP-X4021N:
Table of Contents

Advertisement

Restriction on Schedule function
in
Intellectual
Stack. If input port is tried to change to any port that is allowed to
use on
Intellectual Stack
not the schedule will not be done.
X *2): The schedule can put into
Intellectual
Stack, but the schedule will not be executed.
X *3): The schedule setting cannot put into
working in
Intellectual
• If the schedule is not executed, an alert message will be sent out in
NOTE
any case in accordance with
(Network Guide
• If the schedule function is set to turn off the power,
will be turned off when the projectors are working in
• If the schedule function on
projectors will start to work in accordance with
• When two projectors are working in
displaying some menu on screen the schedule function for
Messenger
on the other projector will not be executed.
• Power Off in the chart means that the projector is turned off by settings on
Intellectual Stack
panel of
Main
projector, and is in standby mode.
• The projectors cannot be turned on by the schedule function on
Set it on
Main
projector if necessary.
• When
Sub
projector is turned off in
on
Sub
projector to turn off
(continued)
by schedule function the schedule will be executed, but if
Web Control
Stack. The schedule will not be executed.
Schedule Execution Error
3. Web Control
Main
projector is set to turn on the power, the
or by
STANDBY/ON
Sub
will be executed without an error.
Restriction on Schedule function
even if the projector is working in
Web Control
3.6 Alert
Settings).
Main
Intellectual
LAMP MODE
DUAL
mode, while a projector is
button on the remote control or control
ALTERNATE
mode, the schedule function
35
while the projector is
setting on
Web
Control.
and
Sub
projectors
Stack.
setting.
My Image
and
Sub
projector.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cp-x5021nCp-wx4021n

Table of Contents