Epson ELPMB27 Installation Manual page 13

Short throw projector wall mount
Hide thumbs Also See for ELPMB27:
Table of Contents

Advertisement

2)
Position the wall plate over the marks you made in step 1, and then mark the points where the wall plate will be secured
as shown in the following illustration.
Insert the anchors into at least three points.
If you insert four anchors, use the four point As or four point Bs as shown below.
For 3 points
3)
Drill holes of the following diameters and depths at the points you marked.
Drill diameter
8.5 mm (0.33 inches)
Pilot hole depth
40 mm (1.57 inches)
Anchor hole depth
35 mm (1.38 inches)
4)
Use a device such as a dust pump to clean out concrete dust from the hole.
5)
Position the wall plate on the wall and insert M8 x 50 mm expansion anchors into the holes. Attach the nut and tap it
with a hammer until the core touches the top of the anchor.
6)
Tighten the nut with a spanner to secure the wall plate to the wall.
For 4 points
13

Advertisement

Table of Contents
loading

Table of Contents