1
6.5 Establishing cable connections
The electrical connections to the machine head are passed through the central plug-in
connector 1.
–
Introduce the plug into the bush of the sewing machine head.
–
Pass the plug through the table top opening and introduce into the bush ST2 of the
drive controller.
6.6 Installing the positioner
–
Slip the positioner 3 onto the handwheel flange.
The slot 6 on the positioner housing must catch over the anti-rotation element 5 on
the belt guard.
–
Tighten both threaded pins 2 on the position transmitter ring 4.
–
Lead the connection cable 7 through the table top bore-hole and pass it down.
–
Introduce the plug of the connection cable into the bush B1 of the drive controller.
16
4
5
2
3
6
7