Overview
Installation of the AQL-CHEM-3 requires:
•
Setup and installation of the Stenner pump/tank
•
Installation of the Feed Tube and Injector assembly to the return plumbing
•
Connection of the AQL-CHEM-3 to the pool control
•
Programming the pool control for use with the AQL-CHEM-3
•
Filling the Stenner pump/tank
FROM
POOL
Installation
FROM
SPA
4
Stenner Pump
Input
Output
TO
POOL
TO
SPA