Hayward Aqua Rite® Pro Installation And Operation Manual page 7

Model: aql-chem-3 installation and operation
Hide thumbs Also See for Aqua Rite® Pro:
Table of Contents

Advertisement

3. Fasten the Injector assembly to the return pipe and install the Feed Tube
Fasten the injector assembly to the return pipe by pushing the injector fitting into the
7/16" hole. Tighten the hose clamp until the assembly is snug against the return pipe.
Do not overtighten.
Cut the 20' feed tube to the desired length. Connect one end of the feed tube to the
injector assembly by firmly pushing it into the flow indicator and handtightening the
fitting. Connect the other end of the feed tube to the output side of the Stenner pump
as shown below.
Stenner pump
Fill the tank
Fill the tank with acid based on the guidelines provided in this manual and the Stenner
manual.
Use a diluted mixture of 4 parts water to 1 part Muriatic acid (20º Baume hydrochloric
acid 31.45% by weight). Always add acid to water, and do so slowly. Fill the 15 gallon
tank to the following levels:
5 gallons of 4:1 solution for pools up to 15,000 gallons of water
10 gallons of 4:1 solution for pools up to 30,000 gallons of water
15 gallons of 4:1 solution for pool above 30,000 gallons of water
Connect the AQL-CHEM-3 to the Aqua Rite Pro or Pro
Logic control
Plug the Stenner pump's linecord into the pH Dispense pigtail of the Aqua Rite Pro or
Pro Logic. This pigtail is provided with the AQL-CHEM. If the pigtail isn't already
installed, refer to the AQL-CHEM product manual for installation instructions.
Program the Aqua Rite Pro or Pro Logic
The pool control must now be programmed to operate the AQL-CHEM-3. Refer to the
Aqua Rite Pro or Pro Logic operation manual for specific programming instructions.
Output
Input
Feed Tube
6
Pool Return Pipe
Injector Assembly

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pro logic

Table of Contents