Download Print this page

Installing The Cable Management Arm - HP DL580 - ProLiant - G4 Installation Instructions Manual

Quick deploy rail system
Hide thumbs Also See for DL580 - ProLiant - G4:

Advertisement

CAUTION: Be sure to keep the product parallel to
the floor when sliding the server into the rails.
Tilting the product up or down could result in
damage to the slides.
Installing the cable
management arm
IMPORTANT: If you need to hinge the cable
management arm on the rear right-hand side of the
rack, see the instructions located in "Converting the
cable management arm swing" and perform the steps
to convert the arm to a right-hand swing before
installing the arm on the rack. After conversion,
mirror the installation steps on the rear right-hand
side of the rack.

Advertisement

loading

This manual is also suitable for:

Dl785 - proliant - g53-7u