Installation Instructions - GE PV976NSS Owner's Manual & Installation Instructions

Chimney vent hoods
Table of Contents

Advertisement

Available languages

Available languages

5 CONNECT DUCTWORK
• Remove shipping tape from the damper.
• Install ductwork, making connections in the
direction of airflow as illustrated.
• Secure joints in ductwork with sheet metal
screws.
• Wrap all duct joints and the flange connections
with aluminized duct tape for an airtight seal.
Duct tape
over seam
and screw
CAUTION:
screws at the hood flange connection. Doing
so will prevent proper damper operation. Seal
connection with tape only.
6 CONNECT ELECTRICAL
Verify that power is turned off at the source.
WARNING:
with a ground wire, a ground must be provided by
the installer. When house wiring is aluminum, be
and aluminum-to-copper connectors.
and the knockout on the top left side.
Knockout
Junction
16

Installation Instructions

Airflow
Screw
Do not use sheet metal
If house wiring is not 2-wire
6 CONNECT ELECTRICAL
with a strain relief (not provided).
• Connect the white lead to the branch circuit white
lead.
• Connect the black lead to the branch circuit black
lead.
circuit green lead or bare ground lead.
• Secure all the connections with wire nuts on
each electrical connector.
replace the cover. Be sure the wires are not
pinched.
• Secure the
original screws.
the 6
49-80549-2

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Pv976Pv970

Table of Contents