Recirculating; Determine Installation Height - GE PV976NSS Owner's Manual & Installation Instructions

Chimney vent hoods
Table of Contents

Advertisement

Available languages

Available languages

DETERMINE INSTALLATION HEIGHT

• Telescopic duct covers are provided to conceal
the ductwork running to the ceiling.
• This hood can be installed for recirculating
operation. Recirculating Kit included with hood.
NOTE: Installation height should be measured from
the cooking surface to the straight portion of the
hood.
The vent hood must be installed 24" min. and
installation height, from the cooking surface to the
bottom of the hood, depends upon ceiling height
and duct cover limitations.
49-80549-2
Installation Preparation
24" Min.
36" Min.
PV970, PV976
Upper Duct Cover
Lower Duct Cover
Actual
Ceiling
*Possible VENTED
Height
Installation Height
7' 11"
24" to 30"
8' 0"
24" to 30"
8' 1"
24" to 30"
8' 2"
24" to 30"
8' 3"
24" to 30"
28"
8' 4"
24" to 30"
8' 5"
24" to 30"
8' 6"
24" to 30"
8' 7"
24" to 30"
8' 8"
24" to 30"
8' 9"
24" to 30"
8' 10"
24" to 30"
8' 11"
24" to 30"
9' 0"
24" to 30"
9' 1"
24" to 30"
9' 2"
25" to 30"
9' 3"
26" to 30"
9' 4"
27" to 30"
9' 5"
28" to 30"
9' 6"
29" to 30"
9' 7"
30"
9' 8"
9' 9"
9' 10"
9' 11"
10' 0"
10' 1"
10' 2"
10' 3"
*Based on 36" countertop height
25.81
27.56
Counter to Hood Height
*Possible

RECIRCULATING

Installation Height
24"
24" to 25"
24" to 26"
24" to 27"
24" to
24" to 29"
24" to 30"
24" to 30"
24" to 30"
24" to 30"
24" to 30"
24" to 30"
24" to 30"
24" to 30"
24" to 30"
24" to 30"
24" to 30"
24" to 30"
24" to 30"
24" to 30"
25" to 30"
26" to 30"
27" to 30"
28" to 30"
29" to 30"
30"
13

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Pv976Pv970

Table of Contents