TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
Pencil and tape measure
Spirit level
Phillips screwdriver
#2 Phillips and flat head
Step ladder
UL listed wire nuts
Aluminized
Strain relief
Duct tape
for junction
49-80549-2
Installation Preparation
Safety glasses
Hammer
Flashlight
Metal snips
Pliers
stripper
Saber saw or Key Hole saw
8" round metal
duct, length to
suit installation
120V 60Hz. 15 or 20 Amp,
2-wire with ground, properly
grounded branch circuit
REMOVE THE PACKAGING
CAUTION:
against sharp edges.
• Remove the duct covers.
• Remove the hardware bag, literature package and
• Remove and properly discard the protective plastic
wrapping and other packaging materials.
• Remove packing foam from behind the blower.
Wear gloves to protect
11