Planning Data Paths; Amount Of Bandwidth Required; Fibre Channel Requirements - HP StorageWorks P9000 User Manual

Continuous access synchronous for mainframe systems user guide
Hide thumbs Also See for StorageWorks P9000:
Table of Contents

Advertisement

Table 17 Order of starting initial copy being performed
Order of starting initial
copy
1
2
3
4
5
6
The Priority is determined within the range of the number of initial copy operations performed at
the same time. Therefore, until the first initial copy operations complying with the order of the
Priority are completed, the additional initial copy operations are not started.

Planning data paths

A data path must be designed to adequately manage all possible amounts of data that could be
generated by the host and sent to the M-VOL and R-VOL. This section provides requirements and
planning considerations for the following key elements of the data path:
"Amount of bandwidth required" (page 36)
"Fibre Channel requirements" (page 36)
"Supported data path configurations" (page 37)
"Planning ports" (page 38)

Amount of bandwidth required

Sufficient bandwidth must be present to handle data transfer of all workload levels. The amount
of bandwidth required for your Continuous Access Synchronous Z system is based on the amount
of I/O sent from the host to the main volume. You determine required bandwidth by measuring
write-workload. Workload data is collected using RMF data. Consult your HP account team for
more information.

Fibre Channel requirements

The main and remote disk arrays must be connected using multimode or single-mode optical fiber
cables.
For distances up to 1.5 km (4,920 feet), multimode shortwave Fibre Channel interface cables
are used. For distances between 0.5 km to 1.5 km, with at least one switch are required. You
can use a maximum of two switches.
For the distances from 1.5 km to 10 km, (4,920 feet to 6.2 miles) single mode longwave
optical fiber cables are required.
36
Planning for Continuous Access Synchronous Z
M-VOL
Value set for Priority
LDEV 02
1
LDEV 00
2
LDEV 01
3
LDEV 03
4
LDEV 1 1
1
LDEV 10
2
Remarks
Cnt Ac-S Z pair for which initial copy
is already instructed to be performed
Cnt Ac-S Z pair for which initial copy
is already instructed to be performed
Cnt Ac-S Z pair for which initial copy
is already instructed to be performed
Cnt Ac-S Z pair for which initial copy
is already instructed to be performed
Cnt Ac-S Z pair for which initial copy
is newly instructed to be performed
Cnt Ac-S Z pair for which initial copy
is newly instructed to be performed

Advertisement

Table of Contents
loading

Table of Contents