Allied Telesis AT 8000/8POE Installation Manual page 7

Layer 2 fast ethernet switch
Table of Contents

Advertisement

Figures
Figure 1. AT-8000/8POE Front Panel..................................................................................................................................17
Figure 2. AT-8000/8POE Back Panel ..................................................................................................................................17
Figure 3. Port LEDs .............................................................................................................................................................20
Figure 4. Power Workgroup Topology .................................................................................................................................29
Figure 5. Collapsed Backbone Topology.............................................................................................................................30
Figure 6. Attaching the Rubber Feet ...................................................................................................................................37
Figure 7. Attaching the Rack-Mount Bracket .......................................................................................................................38
Figure 8. Mounting the Switch on the Rack .........................................................................................................................39
Figure 9. Removing the Dust Plug from the SFP Slot .........................................................................................................41
Figure 10. Inserting the SFP................................................................................................................................................42
Figure 11. Connecting the Twisted Pair Data Cables..........................................................................................................43
Figure 12. Removing the Dust Cover from the SFP. ...........................................................................................................44
Figure 13. Connecting the Fiber Optic Cable ......................................................................................................................44
Figure 14. Plugging in the AC Power Cord..........................................................................................................................45
Figure 15. Connecting the Console Cable...........................................................................................................................46
Figure 16. Login Menu.........................................................................................................................................................47
Figure 17. Main Menu..........................................................................................................................................................47
Figure 18. Entering a Switch's IP Address in the URL Field................................................................................................48
Figure 19. AT-S81 Login Dialog Box ...................................................................................................................................48
Figure 20. Home Page for the AT-8000/8POE Fast Ethernet Switch..................................................................................49
Figure 21. RJ-45 Connector and Port Pin Layout................................................................................................................55
7

Advertisement

Table of Contents
loading

Table of Contents

Save Article as PDF