Slide each snap clamp over the end of each power cord overmold, and then squeeze each snap
11.
clamp closed.
When the enclosure powers up for the first time, it might take up to 5 minutes before all blades are
initialized and recognized by the Onboard Administrator. The time it takes to complete initialization
depends on the number of blades configured in the enclosure. For example, a full enclosure of 16 blades
might take 5 minutes to power up, while an enclosure with fewer blades might take less time. Server
blades are powered up incrementally, starting from device bay 1.
When first initialized, the Onboard Administrator programs the mezzanine cards on the blades during
discovery. After the mezzanine cards are programmed, powering up the enclosure takes only 1 to 2
minutes.
The enclosure and the Insight Display now have power. Configure the enclosure
Display installation
PDU installation
The PDU can be installed in either a 1U or a 0U configuration. See the installation instructions that came
with the PDU for specific details on installing the PDU in the rack.
NOTE:
NOTE:
PDU. Do not exceed the rated current on circuit breakers.
To connect power to the PDU:
Connect the AC power cables to the power connectors on the rear of the enclosure corresponding to
1.
the power supply that was populated on the front of the enclosure.
steps" on page 64) using the Insight Display.
Rack-based single-phase PDUs cannot be used with a three-phase power configuration.
Total VA load of the attached enclosures should not exceed the VA capacity of the
("Running the Insight
Cabling and powering up the enclosure 61