Step 4: Connect Power - Digi 9P 9360/9750 User Manual

Lxnetes
Table of Contents

Advertisement

G e t t i n g S t a r t e d
Figure 3-2: Seyon Settings

Step 4: Connect power

Connect the included power supply to the development board. After power-on, the LEDs
on the board will light up and 2-4 seconds later the system will print boot messages on the
console. After 20-25 seconds, the boot loader has unpacked and launched the pre-installed
Linux kernel from the built-in Flash memory.
You will see output on the terminal client similar to the output below.
2 3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Connectcore 9p 9360Connectcore 9p 9750

Table of Contents