Advertisement

Quick Links

Growatt New Energy
Download
Manual
Shenzhen Growatt New Energy Co., Ltd
4-13/F, Building A, Sino-German (Europe) Industrial Park,
Hangcheng Ave, Bao'an District, Shenzhen, China
T
+86 0755 2747 1942
E
service@ginverter.com
W
www.ginverter.com
GR-UM-210-A-00
Installation
&
Operation Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MIN 9000TL-XH-US and is the answer not in the manual?

Questions and answers

Summarization of Contents

Document Information
Validity and Target Audience
Describes valid inverter models and qualified personnel for installation.
Manuals and Symbols Reference
Guidelines for manual storage and explanation of document symbols.
Glossary of Terms
Defines key technical terms like AC, DC, Energy, and Power.
Safety Precautions
General Safety and Intended Use
Key safety warnings, proper application, and installer qualifications.
PV System Safety Guidelines
Covers grounding, disconnects, and usage for PV systems.
Electrical and Operational Safety
Warnings for electrical connections, operation, and assembly.
Product Overview
Inverter Components and Labels
Visual identification of inverter parts and label details.
Physical and Safety Features
Inverter dimensions, weight, and AFCI functionality.
Handling and Transportation
Guidelines for safe handling and transport of the inverter.
Delivery and Installation
Unpacking and Inspection
Steps for checking contents upon delivery and unpacking.
Installation Site and Mounting
Procedures for selecting an installation location and mounting the inverter.
Electrical Connections
Connection Safety and Requirements
Safety, intended use, breaker requirements, grid types, PV strings, and cables.
Connection Points and Grounding
Overview of all connection areas, DC, communication, RGM, and grounding.
Power, Battery, and Meter Wiring
Details on AC, backup, ATS-US, battery, and energy meter connections.
Communication and Troubleshooting
RS485, LAN setup, and energy meter troubleshooting.
Commissioning and Operation
Pre-Operation Checks and Powering
Steps before and during system power-on/off.
LED Status and Button Functions
Interpretation of LED indicators and button operations.
Shinephone App Usage
App Overview and Setup
Introduction, download, and initial connection via Wi-Fi.
App Configuration and ESS Modes
Wi-Fi network configuration and ESS mode settings.
Maintenance and Troubleshooting
Routine Maintenance Procedures
Checks and cleaning for inverter health.
Fault Diagnosis and Error Resolution
Identifying and resolving system and inverter faults.
Decommissioning Procedures
Dismantling, Packing, and Disposal
Steps for removing, packing, and disposing of the inverter.
Technical Data
Inverter Specifications
Detailed technical parameters of the inverter.
Performance Curves and Limits
Efficiency curves and ambient temperature derating.

Table of Contents