System Overview
EI System Components
Details the Inverter, Link, TS4 MLPE, BMS, and Battery.
Safety Guidelines
Safety Symbols and Markings
Explains manual symbols and enclosure markings for hazards.
Pre-Installation
Location Requirements
Specifies the optimal installation location for EI components.
Wiring Overview
Introduces the system wiring configurations.
Wiring Configurations
Single-Phase AC Connections
Details the AC wiring for single-phase systems.
Single-Phase DC Connections
Details the DC wiring for single-phase systems.
Three-Phase AC Connections
Details the AC wiring for three-phase systems.
Three-Phase DC Connections
Details the DC wiring for three-phase systems.
Earthing Requirements
Explains the required earthing methods for the EI solution.
Installation
Battery Placement and Components
Instructions for placing batteries and listing BMS/Battery components.
Battery Installation Details
Guides on placing the battery base and securing it.
Additional Battery Installation
Instructions for installing additional batteries.
System Bracket Installation
Bracket Assembly and Mounting
Guides on assembling and mounting the system bracket.
Component Installation
Inverter Installation
Process for mounting the EI Inverter.
EI Link Installation
Steps for installing the EI Link module.
TS4 MLPE Installation
Attaching TS4 devices to PV modules.
Tigo Access Point (TAP) Installation
Installing the TAP for wireless communication.
BMS Installation
Steps to place and secure the BMS unit.
Connections and Cabling
Connecting the EI Link
Guides on connecting the link to the inverter.
Link Cable Routing
Instructions for routing EPS and GRID cables.
Link AC Connections
Details AC connections from the main breaker panel.
Link LOAD and PV Connections
Connecting breakers to LOAD terminals and PV strings.
BMS to Inverter Connection
Connecting battery charging cables between BMS and inverter.
Battery Connection
Connecting the BMS to single or multiple EI batteries.
Battery Connection Examples
Illustrates connection diagrams for two and three-battery setups.
Four-Battery Configuration
Provides a diagram for a four-battery setup.
Commissioning
Pre-Commissioning Checks and Power-On
Verifying connections and safely powering on the EI system.
Tigo Energy Intelligence App Usage
Overview of app setup and adding components.
App: System Information
Entering System Details
Entering system name and turn-on date in the app.
App: Equipment Selection
Adding EI Components to App
Scanning or manually entering EI components into the app.
App: Inverter Configuration
Internet and Inverter Settings
Configuring internet connection and inverter parameters.
App: Meter and Battery Settings
Configuring Meters and Limit Options
Setting up AC Meter, Battery Settings, and Main Breaker Limit.
App: Warranty and PV Setup
Scanning Barcodes and PV Setup
Capturing barcodes and setting up PV modules/TS4s.
App: String Configuration
Adding PV Strings to App
Selecting string details and saving the PV configuration.
App: Layout Configuration
Mapping Equipment on Layout Grid
Placing and arranging system components on the layout grid.
App: TS4 Identification
TS4 Device Identification Methods
Methods for identifying TS4 devices (Bulk Scan, Manual).
App: TS4 Scanning Methods
Bulk Scan and Individual Scan
Using Bulk Scan or individual scanning for TS4s.
App: Manual TS4 Entry
Manual TS4 Data Input
Manually entering TS4 data via barcode icon.
Module Orientation Verification
Verifying consistent portrait or landscape orientation of modules.
App: Communication Setup
Bluetooth Communication and Discovery
Enabling Bluetooth for the Discovery process.
App: Discovery Process
Starting System Discovery
Initiating the discovery process for system components.
App: System Access
Setting Access Permissions
Configuring access for installers and owners.
Complete Commissioning
Finalizing Operation Mode
Pressing the Enter button to set the inverter to normal operation.
Reference
Torque Specifications
Table of torque values for electrical connections.
Status LCD Indicators
Explanation of inverter LED indicators for system status.
System Operations
Procedures for powering off, decommissioning, and maintenance.
Error Codes
Inverter Error Codes
Lists common inverter fault codes and troubleshooting.
Additional Inverter Error Codes
Covers further inverter fault codes and remedies.
Battery Error Codes
Lists common error codes related to the BMS and battery.
Product Information
Specifications and Warranty Downloads
Information on where to download product specifications and warranty details.
Customer Support
Support Channels and Requirements
Available support methods and required information.

Table of Contents