1. General Information - Specifications
ATTENTION - READ FIRST
!
1.
This document is for general guidance only. Refer to the Energy Intelligence (EI) Inverter
Installation & Operations Manual for more detail.
2.
Before installing the system, verify that the package contents are intact and complete as
per the packing list. Contact your dealer if there is equipment damage or missing
components.
ATTENTION - Use the appropriate QSG's to perform the physical
!
installation of the EI system in the following order:
1.
EI Battery
2.
EI Inverter
3.
EI Link
4.
EI BMS
1.2 EI Link Overview
PV (INV)
1
2
3
1. PV
2. PV (INV) (preinstalled)
3. EPS (INV)
4. Grid
1.3 Wiring Diagrams
AC Connections
EI Inverter
Grid
EPS
EI Link
Load
Grid
EPS(Inv)
Grid(Inv)
T
S
R
N
G
T
S
R
N
T
S
R
N
N
G
T
S
R
N
G
Main Panel
1.1 Package Contents
Index
Item
1
EI Link
2
EI Link bracket
3
Bridge bracket
4
6mm
2
ferrules
5
Flange nut
6
(Wall anchor, flat washer, lag bolt)
7
16mm
2
grounding terminal
8
16mm
2
ferrules
9
Rubber plug
10
11
Waterproof RJ45 connector
12
Antenna (CCA)
13
Quick installation guide
Ethernet
E-stop
Load
TAP
COM
Grid
Meter
Antenna
4
5
6
7
8
9 10 11 12
5. Grid (INV)
9. Ethernet
6. Load
10. TAP
7. Meter (preinstalled)
11. COM (preinstalled)
8. Antenna (preinstalled)
12. E-stop
DC Connections
EI Inverter
PV1+
PV1+
PV2+
BAT+
PV1-
PV1-
PV2-
BAT-
EI Link
PV
PV(INV)
Grid
PV1+ PV1-
PV1+ PV1-
PV2+ PV2-
Meter
PV Array
N
G
EI BMS
BAT+ BAT-
Main Breaker
2. Installation
Quantity
2.1 Mount EI Link
1
Slide the EI Link on the EI Link
1
bracket below the EI Inverter
1
8
2
2
1
10
2
1
3
1
1
2.2 Secure EI Link
Remove the door and plastic cover of EI Link, slide it on to the
middle bracket and lock it with the M5 screw from the right side.
3. Electrical Connections
CAUTION - Check that all Disconnect switches are OFF before wiring. For personal safety always wear appropriate PPE.
!
3.1 EI Link Wiring
3.1.1 Connect Inverter to EI Link
1.
Run the EPS and grid cables from inverter through
the strain reliefs.
2.
Connect them to the EPS(INV) and Grid(INV)
terminals accordingly (refer to the back of the EI Link
door).
3.
Attach the grounding wire to the grounding bar.
Torque to 1.5 NM.
EPS (INV)
R (21)
S (22)
T (23)
N (24)
EI Link - Three Phase
Quick Start Guide - TSS-3PS
Inverter
bracket
Bridge
EI Link
bracket
Grid (INV)
EPS (INV)
Grid (INV)
R (17)
S (18)
T (19)
N (20)
PE2
PN: 002-00110-00 | REV 1.0 | Oct. 21, 2022
Pg 1 of 3