Download Print this page
Tigo TSI-7.6K-US Quick Start Manual

Tigo TSI-7.6K-US Quick Start Manual

Hide thumbs Also See for TSI-7.6K-US:

Advertisement

Quick Links

Inverter

Advertisement

loading
Need help?

Need help?

Do you have a question about the TSI-7.6K-US and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Tigo TSI-7.6K-US

  • Page 1 Inverter...
  • Page 2 AC (right side) Quick Start Guide Mounting Bracket EnergyMeter EnergyMeter EI Inverter EI Inverter 3. Electrical Connections Tigo Access Point (TAP) 2.3 Mounting Rapid Shutdown label CT L1 CT L2 CT L1 CT L2 ACGrid ACGrid CAUTION - Use appropriate hardware for...
  • Page 3 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 RJ-45 Male Plug NOTE: The TSI-7.6K-US has 3 MPPTs, the TSI-11.4K-US has 4 Install the battery communications conduit to the COM battery MPPTs. input opening (10), use appropriate conduit fittings and bond where necessary.
  • Page 4 Ensure the e-stop button (if used) is not in the de-pressed position. the signal conductors. Open the Tigo EI app to complete commissioning by making all required inverter and battery settings. Connect the conductors to the RSD switch as shown.
  • Page 5 EI Inverter Quick Start Guide - TSI-7.6/11.4K-US Pg 4 of 4 Place TS4-A-O barcode stickers in the grid below per the system azimuth and layout for scanning into the EI App. Ver. Dec. 20, 2021 PN: 002-00078-00 Examples:...
  • Page 6 Battery...
  • Page 7: Installation

    EI Battery Storage Quick Start Guide - TSB-10/20-US Pg 1 of 3 2.3 Mounting 1. General Information - specification CAUTION - Ensure 12” clearance around all sides. Use appropriate hardware for the mounting surface. 1.1 Package Contents For personal safety always wear appropriate PPE. ≥12”...
  • Page 8 EI Battery Storage Quick Start Guide - TSB-10/20-US Pg 2 of 3 3.3 Battery expansion - cont. 3. Connecting the Batteries Note – This section applies to systems with multiple battery enclosures. The battery expansion cables/conductors should not exceed 6ft-7in. 3.1 Wiring the upper battery If installing only one enclosure, skip this step.
  • Page 9 An appropriate installation space had been chosen and the environment is left clean and accessible. 9. Your Customer Service Contact 6. Powering on the battery storage system Tigo Energy, Inc. CAUTION – For personal safety always wear appropriate PPE. 655 Campbell Technology Pkwy Campbell, CA 95008 Note –...
  • Page 10 50A ATS...
  • Page 11 EI Automatic Transfer Switch (ATS) Quick Start Guide - TSS-50-US Pg 1 of 2 1. General Information 2. Installation 2.1 Mounting ATTENTION – READ FIRST CAUTION - Use appropriate hardware This document is for quick guidance only. For details, please refer to the Energy Intelligence (EI) ATS Installation & Operations Manual. for the mounting surface Damage caused by failure to follow the contents of the EI ATS Installation &...
  • Page 12: Troubleshooting

    Open the ATS door and check the grid and INV conductors are properly connected to the correct terminals. switch over when there is loss of grid. If issues persist, please contact Tigo Customer Service team. Turn OFF the EI Inverter and the grid.
  • Page 13 200A ATS v1...
  • Page 14 2.1 Mounting & opening the ATS ATTENTION – READ FIRST Although the Tigo ATS comes with This document is for quick guidance only. For details, please refer to the Energy Intelligence (EI) ATS Installation & Operations Manual. mounting hardware, use the appropriate hardware for the mounting surface.
  • Page 15 EI Automatic Transfer Switch (ATS) Quick Start Guide - TSS-200-US Pg 2 of 3 3.2 Grid connections 3.4 Inverter communications connections Check that the Grid disconnects/breakers, if The COMMUNICATIONS cable must be connected before present, are in the OFF position before wiring the the INVERTER power connections.
  • Page 16: Led Status

    Open the ATS door and check the grid and INV conductors are properly connected to the correct terminals. switch over when there is loss of grid. No Grid power If issues persist, please contact Tigo Customer Care team. Normal operation Communications...
  • Page 17 200A ATS v2...
  • Page 18 2.1 Mounting & opening the ATS ATTENTION – READ FIRST Although the Tigo ATS comes with This document is for quick guidance only. For details, please refer to the Energy Intelligence (EI) ATS Installation & Operations Manual. mounting hardware, use the appropriate hardware for the mounting surface.
  • Page 19 EI Automatic Transfer Switch (ATS) Quick Start Guide - TSS-200-US Pg 2 of 3 3.2 Grid connections 3.4 Inverter communications connections Check that the Grid disconnects/breakers, if The COMMUNICATIONS cable must be connected before present, are in the OFF position before wiring the the INVERTER power connections.
  • Page 20 Open the ATS door and check the grid and INV conductors are properly connected to the correct terminals. switch over when there is loss of grid. No Grid power If issues persist, please contact Tigo Customer Care team. Normal operation Communications...
  • Page 21 Template...
  • Page 22 4.1 Mounting the RSD initiation switch Note – This connection feeds all power sources to the main load panel to the home. CAUTION - Use appropriate hardware for the mounting surface. Using a Philips head screwdriver, unscrew the 4 plastic screws of the assembled RSD initiation switch to open the enclosure.
  • Page 23: Document Name

    Document Name Document Name - Subtitle Section 1 Header Section 2 Header Body Text // Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.
  • Page 25 EI Inverter Quick Start Guide - TSI-7.6/11.4K-US Pg 4 of 4 Place TS4-A-O barcode stickers in the grid below per the system azimuth and layout for scanning into the EI App. (35mm x 35mm) Examples:...
  • Page 26 5. Turn on the disconnect switch between Grid and the inverter. wiring box. 6. Open the Tigo EI app to complete commissioning and make all required inverter and battery settings. QR code to the right. Get the Tigo EI App 3.Remove the cable's external insulation using a crimping...
  • Page 27 ¾” Conduit hole plugs 1” Conduit hole plugs ≥300mm Mounting Bracket RS485 6-pin connector Dimensions W (mm/inch) H (mm/inch) D (mm/inch) RS485 3-pin connector (meter) TSI-7.6K-US 400/15.75" 569/22.41" 177.5/6.98" AC wire ferrules TSI-11.4K-US 400/15.75" 649/25.55" 187/7.36" DC wire ferrules Safety-lock screw Self-tapping screw 3.
  • Page 28 **Old** EI Battery Storage Quick Start Guide - TSB-10/20-US 2.3 Remove TSB-10/20-US front cover 1. General Information - specification 2. Remove screws from both sides of door 3. Unlatch front door from bottom 1. Remove bottom plate Door locking clips (behind front panel) 12 3 4567 8 6 10 11...
  • Page 29 1.Check whether the TSB-10/20-US has been connected to inverter, otherwise it cannot start up and operate. 8. Service contact 2.The Ground cable is connected correctly and securely. Tigo Energy, Inc. 3.The BAT-disconnect switch (4) and all the switches connecting to the TSB-10/20-US are OFF. 655 Campbell Technology Pkwy 4.The BAT+/BAT- output power conductors and signal cable are connected correctly and securely.
  • Page 30 EI Battery Storage Quick Start Guide - xxx-xxx-xxx After completing the Pre-power checklist, close the cover and torque the Allen screws to 1.8ft-lbs (2.5 Nm). If the battery, inverter, and grid installations/connections are complete, the system may now be turned on for operation. Close/turn on the EI Inverter’s DC disconnect switch and, if present, ensure the rapid shutdown e-stop button is in the up/ON position.

This manual is also suitable for:

Tsi-11.4k-us